Moving Floor Installation Steps

1. Laying the ground must be flat and clean.

2.PVC plastic sports floor before laying, it is necessary to spread the ground in advance for more than 24 hours, and the site temperature should not be less than 15 ℃. When the floor is restored, the two ends of the cutting should remain 5cm. Before pasting, will expand the floor reverse roll up about half, then scrape the glue to lay-starts from the middle-glue uses the toothed scraper to carry on the construction.

3. According to the number sequence of floors, alignment combined, pay attention to the paving process to align the site line.

4. Open two adjacent floors along the joint, manufacturers supporting the use of a dedicated connection to the next side of the joint, in the connection with the surface of the brush, the first one of the plate to adhere to the half of the belt, and then the other half glued to the remaining connection belt, the gap can be tight.

5. It is recommended to use water soluble glue to construct harmless human body. Floor paste with cork block from the middle to both ends of the floor to squeeze the surface of the flat without bubble, the most complete rolling formation.

6. After the floor is glued to the groove, welding, after welding to the welding line leveled.